Categories
Business

Molten Salt Receiver installed at MBR Solar Park’s 262.44m CSP Tower – Construction Week Online

The MSR was lifted & installed as part of the project’s Phase 4 in the presence of HH Sheikh Ahmed bin Saeed Al Maktoum

  1. Molten Salt Receiver installed at MBR Solar Park’s 262.44m CSP Tower